LIBERO COPPER MOBILIZES FOR EXPLORATION AT THE MOCOA PORPHYRY COPPER-MOLYBDENUM DEPOSIT

In This Article:

Upcoming drilling to follow up on MD-043 that intersected 1,228.5 metres averaging CuEq* of 0.58%, including 840.3 metres of 0.72% CuEq*

VANCOUVER, BC, Sept. 17, 2024 /CNW/ - Libero Copper & Gold Corporation (TSXV: LBC) (OTCQB: LBCMF) (DE: 29H) ("Libero Copper" or the "Company") is pleased to announce mobilization to support exploration activities at its flagship Mocoa Porphyry Copper-Molybdenum Deposit, located in Colombia's Jurassic Copper Belt, near the town of Mocoa, Putumayo. This phase of mobilization marks the final preparatory steps ahead of a 14,000-metre drill program designed to expand the resource and test new high-priority porphyry targets across the region.

Highlights

  • Upcoming 14,000-Metre drill program: the team is in the final stages of planning a 14,000-metre drill program for Q4-2024 through H1-2025 focused on infill, resources expansion, and testing of new targets.

  • Resource expansion and follow-up of drill hole MD-043: upcoming drilling will focus on follow-up of i) the high-grade core of MD-043 that intercepted 250.8m at 1.12% copper equivalent (CuEq*) [0.74% copper (Cu) and 0.114% molybdenum (Mo) and ii) a 2 kilometre by 800-1,000 metre copper-molybdenum soil anomaly surrounding the resource area.

  • Field program work: Fieldwork will focus on prioritizing and preparing for drill tests on nine additional porphyry targets identified in the area, supported by geophysical data and geochemistry of rock samples (see news release May 03, 2022).

"We're at an exciting milestone at the Mocoa Porphyry Copper-Molybdenum Deposit, built on a foundation of extensive geological work and strong relationships. We are preparing to follow up on the impressive copper intersections from MD-043. Detailed fieldwork has only reinforced what we believed all along: Mocoa Deposit holds immense potential," comments Ian Harris, President and CEO. "But this moment is about more than just geology—it's about the foundation we've built through close collaboration with local communities, key partnerships and government. I'm particularly proud of the commitment shown by our team and local stakeholders. Together, we are unlocking the full potential of Mocoa Deposit for the benefit of Mocoa, Putumayo, and Colombia."

Mobilization Activities

Significant preparatory activities are currently underway, including the hiring of key personnel (see photo 1), ensuring the camp is fully equipped and operational, maintenance and testing of the first drill rig already on site, securing rain water supply, and reopening vital access routes to the exploration camp and drill sites. These routes provide crucial access for personnel and supplies, minimizing operational costs by eliminating the need for helicopter support.