Snowline Gold Drills 404.8 m of 2.3 Grams per Tonne Gold Including 100.8 m of 4.7 Grams per Tonne Gold From Surface, Outperforming Valley Deposit Initial Resource Estimate in First Holes of 2024

In This Article:

  • Hole V-23-071, collared in a large gap in coverage at the Rogue Project's Valley deposit, returned 449.7 m averaging 1.77 g/t Au from surface, including 169.2 m of 2.89 g/t Au, surpassing initial MRE block model grade predictions by +36%

  • Hole V-23-072 returned 404.8 m averaging 2.27 /t Au, including 100.8 m averaging 4.67 g/t Au from surface, consistent with MRE block model prediction overall and slightly outperforming the model near surface

  • Mineralization, including visible gold, encountered in large step-outs in first holes of Phase II program at Einarson Project's Jupiter target.

VANCOUVER, BC / ACCESSWIRE / July 24, 2024 / SNOWLINE GOLD CORP (TSX-V:SGD)(OTCQB:SNWGF) (the "Company" or "Snowline") is pleased to announce analytical results from the first two drill holes of its 2024 exploration campaign and to provide an exploration update from its ongoing 5-drill program in Canada's Yukon Territory. Hole V-24-071, collared in the high-grade, near-surface section of the Valley deposit, averages 1.77 g/t Au over 449.7 m from surface, including 2.89 g/t Au over 169.2 m. This result exceeds that predicted by the Company's initial mineral resource estimate (MRE) for Valley by 36% overall. Hole V-24-072 averages 2.66 g/t Au over 295.3 m, including 4.67 g/t Au over 100.8 m from surface, in line with expectation but with slightly (1%) more gold than predicted in the top half of the hole. At the Jupiter target on the nearby Einarson Project, trace visible gold has been encountered in a 174 m step-out from previous holes, along with widespread mineralization. Drilling is ongoing at Valley and on other targets, with assays pending for an additional 13,000 m drilled to date.

Table 1 - Highlight summary of Snowline's latest assay results. Note that the headline interval for V-24-072 comprises multiple intervals separated by small gaps; see Table 2 for details. *Interval widths reported; true widths of the system are not yet known.

"We are encouraged by such a strong start to our 2024 exploration campaign and excited to have regional drilling underway," said Scott Berdahl, CEO & Director of Snowline. "Our first two holes of the season at our Rogue Project's Valley deposit underscore the strength and consistency of the deposit, particularly when it comes to high-grade, near-surface gold mineralization. We eagerly await assay results from the many additional holes drilled within and adjacent to the current deposit, and we look forward to seeing results from additional Valley-style gold targets that are set to be drilled soon.