Snowline Gold Drills 471.6 M of 2.4 Grams Per Tonne Gold from Surface And 325.0 M of 2.6 Grams Per Tonne Gold from Surface, Highlighting Strong Grade Continuity at Its Valley Deposit, Rogue Project

In This Article:

  • Hole V-24-075, drilled at 180 degrees to recent highlight hole V-24-072, returned 471.6 m averaging 2.38 g/t Au, including 302.1 m of 3.20 g/t Au from surface, surpassing initial Valley deposit MRE block model grade predictions by +9%

  • Hole V-24-073 returned 325.0 m averaging 2.57 /t Au, including 136.0 m averaging 4.84 g/t Au from surface, slightly outperforming the model near surface

  • Widespread alteration and associated oxide + sulphide mineralization along with granodiorite dikes seen in first-ever drilling of Aurelius target, Rogue Project

  • Updated NI 43-101 technical report filed for Snowline's Einarson Project, Yukon.

VANCOUVER, BC / ACCESSWIRE / August 7, 2024 / SNOWLINE GOLD CORP (TSX-V:SGD)(OTCQB:SNWGF) (the "Company" or "Snowline") is pleased to announce analytical results from additional early-season drill holes on its 2024 exploration campaign and to provide an exploration update from its ongoing 5-drill program in Canada's Yukon Territory. Highlight intervals from the Valley deposit are summarized in Table 1 below. Holes V-24-075 and V-24-073 are the third and fourth highest ranking holes in terms of contained gold from the Valley deposit to date, with V-24-075 exceeding projections based on the initial mineral resource estimate (MRE) by 9% within the resource-limiting pit shell and by 140% outside of it (18% overall). At the Rogue Project's Aurelius target, widespread alteration with oxide and sulphide mineralization is present in volcanic and sedimentary rocks, with granodiorite dikes intersected in two holes in the first ever drill testing of the target. Drilling is ongoing at Valley and on other targets, with assays pending for an additional 15,600 m drilled to date.

Table 1 -Highlight summary of Snowline's latest assay results. Note that the headline interval for V-24-075 comprises two intervals separated by 7 m zone of <0.1 g/t Au; see Table 2 for details. *Interval widths reported; true widths of the system are not yet known.

"We had extremely high expectations for these latest holes at Valley, and they did not disappoint," said Scott Berdahl, CEO & Director of Snowline. "Based on the block model from our initial mineral resource estimate, we would expect a run of 448 m averaging 2.1 g/t Au for hole V-24-075. We meaningfully exceeded this target in both length and grade, with the hole averaging 2.38 g/t Au over the top 471.6 m from bedrock surface, and with an internal interval of 6.48 g/t Au over 22.0 m from 160.0 m downhole exceeding the grade of anything we had predicted. The results exceed the block model most dramatically outside of the current resource estimate boundary. We expect that this demonstration of robust continuity and of viability in our modelling will assist with de-risking and upgrading mineralization, and it could potentially help to expand our resource-limiting pit shell, pending additional results from our ongoing drilling at Valley."